Some capital projects in the Papanui area are proposed by Council to receive less funding in the 2020-21 financial year. Changes include:
- $5m of wastewater renewal reduced to $0
- The cycleway connection through Rutland Reserve between Cranford St and the Papanui Parallel reduced from $2.9m to $0.6m
- The budget for the ‘missing link’ of Northern Line cycleway between Tuckers & Sturrocks Roads reduced from $700k to $0
(Note that the two Papanui cycleway projects have been listed under Innes Ward.)
A breakdown for each Ward showing differences between the original Draft Annual Plan and the current proposal can be found online at: https://ccc.govt.nz/…/long-term-plan…/2020-2021-annual-plan/
The updated Draft Annual Plan is open for feedback until 29 June.